Our client has seen first-hand the unique operational time and cost benefits of utilizing the cantilever system on the GMS Evolution, when carrying out well workover activities.
“The system is capable of carrying out all aspects of well workover activity, normally carried out by a drilling rig, however, its real strength comes when frequent moves within the field are required.
“Being self-propelled, unlike a drilling rig, the Evolution does not rely on tug support, so can move between locations in a fraction of the time.”
Executive chairman of
GULF MARINE SERVICES
Mr. Mansour Al Alami