Well Intervention CT Tower System is used for offshore and onshore well intervention operations.
System provides support structure and enables CT/WL equipment rig-up, running operational tools.
Well Intervention CT Tower System is used for offshore and onshore well intervention operations.
System provides support structure and enables CT/WL equipment rig-up, running operational tools.
Modules are installed by existing platform’s crane and connected together by doubled secured mechanical locks.
The base skidding system makes the tower able to skid in X-Y direction to reach all well slots on platform’s weather deck.
The Telescopic Gin Pole allows the rig-ups to be built safe and efficient without the need for a platform crane. This equipment provides the suspension point during wireline operations.
The Jacking Frame is located on the work deck module. This equipment is used for Injector Head while doing coiled tubing operations. Changing from coiled tubing to wireline work is done by skidding the injector head, stripper and CT BOP out of the well centre by Jacking Frame table and rearrangement of PCE equipment to WL configuration.
If you have any requirements or need further information, please don’t hesitate to contact us.
Most of our products can also be rented through Robust Rental